Joined: 22 Aug 2003 Posts: 2234 Location: Neither Here, Nor There
Posted: Thu, 09 Aug 2007 11:08:23 Post Subject:
I hate this job lol.. trying to get DSL to every frigging subscriber... Utility Commission mandate by 2015..
This Verizon(former GTE) area is sooooo far behind. Only a couple of their remote switches are DSL capable, and they only have a about 5% of the remote switches they need to break up the exchanges.
I have 39 phone exchanges, some of which have loops in excess of 90KFT. ...DSL works out to about 18KFT(1.5MB service). Old cables with 90% or higher fill(number of pairs used in a given cable)... makes for transferring circuits around a b!%@# to get HDSL and T1's to remote DSLAMs.
Joined: 22 Aug 2003 Posts: 2234 Location: Neither Here, Nor There
Posted: Thu, 09 Aug 2007 16:08:21 Post Subject:
lol yeah... but my outfit only has contract until 2009. however, it sounds like they renewed for another 3 years.
This company does things really bass ackwards from other companies I've worked for. I cant fathom some of the reasoning behind the way they design certain things.
All times are GMT - 4 Hours Go To Page Previous1, 2
Page 2 of 2
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum