| knight0334 Rated XXX
 
  
 
 | 
			
				|  Posted: Thu, 09 Aug 2007 11:08:23    Post Subject: |   |  
				| 
 |  
				| I hate this job lol..   trying to get DSL to every frigging subscriber...   Utility Commission mandate by 2015.. 
 This Verizon(former GTE) area is sooooo far behind.  Only a couple of their remote switches are DSL capable, and they only have a about 5% of the remote switches they need to break up the exchanges.
 
 I have 39 phone exchanges, some of which have loops in excess of 90KFT.  ...DSL works out to about 18KFT(1.5MB service).   Old cables with 90% or higher fill(number of pairs used in a given cable)...  makes for transferring circuits around a b!%@# to get HDSL and T1's to remote DSLAMs.
 |  |